<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"><channel>
    <title>The Bid Sheet</title>
    <link>https://thebidsheet.docsanddeadlines.com</link>
    <description>Read the contractor&#x27;s estimate before you sign it.</description>
    <language>en</language>
    <lastBuildDate>Sat, 12 Sep 2026 00:30:30 +0000</lastBuildDate>
    <item>
      <title>R-410A Phase Out: Can You Still Repair Your Existing System</title>
      <link>https://thebidsheet.docsanddeadlines.com/hvac/r-410a-phase-out-repair-existing-system/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/hvac/r-410a-phase-out-repair-existing-system/</guid>
      <description>The ticket says R-410A is banned. The rule is narrower: what 40 CFR 84 prohibits, what a 2026 rule removed, and why a condenser-only R-454B swap fails on paper.</description>
      <pubDate>Fri, 11 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>How Much Deposit for a Contractor: Caps and Lien Waivers</title>
      <link>https://thebidsheet.docsanddeadlines.com/bids/contractor-deposit-progress-payments-lien-waivers/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/bids/contractor-deposit-progress-payments-lien-waivers/</guid>
      <description>Five states cap the deposit, one of them at $1,000. What the cap covers, the bond that suspends it, and the waivers that decide if you pay twice.</description>
      <pubDate>Wed, 09 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>PEX Pipe vs Copper: What the Quote Leaves Out</title>
      <link>https://thebidsheet.docsanddeadlines.com/water/pex-vs-copper-repipe-what-the-quote-leaves-out/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/water/pex-vs-copper-repipe-what-the-quote-leaves-out/</guid>
      <description>A repipe bid names a material and a lump sum. The print string on the tubing, the letter on the copper, and nine excluded lines decide the rest of it.</description>
      <pubDate>Sun, 06 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Parts and Labor Warranty: What Lifetime Actually Owes</title>
      <link>https://thebidsheet.docsanddeadlines.com/warranty/parts-labor-lifetime-warranty-phrases/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/warranty/parts-labor-lifetime-warranty-phrases/</guid>
      <description>A 10-year parts warranty buys the part, not the repair. What parts, labor, lifetime, and prorated each obligate, traced to the certificates by form number.</description>
      <pubDate>Thu, 03 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>HVAC Age by Serial Number: Decoding the Date</title>
      <link>https://thebidsheet.docsanddeadlines.com/timing/read-manufacture-date-serial-number-label/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/timing/read-manufacture-date-serial-number-label/</guid>
      <description>Carrier starts your warranty 90 days after manufacture if the install date can&#x27;t be proven. The serial number is the proof. How each brand encodes the date.</description>
      <pubDate>Mon, 31 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Manual J S and D: How to Tell If Sizing Was Skipped</title>
      <link>https://thebidsheet.docsanddeadlines.com/hvac/manual-j-s-d-how-to-tell-if-sizing-was-skipped/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/hvac/manual-j-s-d-how-to-tell-if-sizing-was-skipped/</guid>
      <description>A bid that says &#x27;sized per Manual J&#x27; owes you a report with nine inputs on it. What each ACCA manual covers, what code requires, and the tells none was run.</description>
      <pubDate>Sun, 30 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Zinsco and FPE Panels: Hazard or Sales Scare</title>
      <link>https://thebidsheet.docsanddeadlines.com/electrical/fpe-zinsco-aluminum-wiring-hazard-or-sales-scare/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/electrical/fpe-zinsco-aluminum-wiring-hazard-or-sales-scare/</guid>
      <description>Three names land in one replacement quote, but their paper trails are nothing alike. What the CPSC file, the court docket, and your insurer&#x27;s form actually say.</description>
      <pubDate>Sat, 29 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Water Heater Repair or Replace: Five Failures Worth Fixing</title>
      <link>https://thebidsheet.docsanddeadlines.com/water/water-heater-repair-or-replace-failures-worth-fixing/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/water/water-heater-repair-or-replace-failures-worth-fixing/</guid>
      <description>A plumber&#x27;s quote names a part. Your tank&#x27;s rating plate names a date and a warranty term. Both decide the answer, and only one of them is in the quote.</description>
      <pubDate>Fri, 28 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>HVAC Warranty Registration: Miss It, Lose Half</title>
      <link>https://thebidsheet.docsanddeadlines.com/warranty/hvac-warranty-registration-window-60-90-days/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/warranty/hvac-warranty-registration-window-60-90-days/</guid>
      <description>Seven warranty certificates from six brands, side by side: who gives you 60 days to register, who gives 90, and what the unregistered column quietly costs.</description>
      <pubDate>Sun, 23 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Drip Edge and Ice Barrier: Are They Really Optional</title>
      <link>https://thebidsheet.docsanddeadlines.com/roofing/ice-barrier-drip-edge-ventilation-optional-line-items/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/roofing/ice-barrier-drip-edge-ventilation-optional-line-items/</guid>
      <description>A roofing bid files three items under optional upgrades. Two are code items with no exception clause; the third can cut a lifetime warranty to ten years.</description>
      <pubDate>Sat, 22 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Repair or Replace HVAC: Where the $5,000 Rule Breaks</title>
      <link>https://thebidsheet.docsanddeadlines.com/timing/repair-or-replace-5000-rule-arithmetic/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/timing/repair-or-replace-5000-rule-arithmetic/</guid>
      <description>Three rules of thumb, one nineteen-year-old furnace, two opposite answers. Where those rules came from, where they fail, and the arithmetic underneath them.</description>
      <pubDate>Sat, 22 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Roofing Estimate: Squares, Layers and Six Missing Lines</title>
      <link>https://thebidsheet.docsanddeadlines.com/roofing/roofing-estimate-squares-pitch-layers-missing-lines/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/roofing/roofing-estimate-squares-pitch-layers-missing-lines/</guid>
      <description>A roof is sold by the square, so a bid with no square count is a price attached to nothing. Pitch, waste, layers, and the six lines usually left off.</description>
      <pubDate>Fri, 21 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Contractor License Lookup: Bond and Complaints Too</title>
      <link>https://thebidsheet.docsanddeadlines.com/permits/look-up-contractor-license-bond-complaints/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/permits/look-up-contractor-license-bond-complaints/</guid>
      <description>Four separate records sit behind the words licensed and insured: the class, the bond, the workers&#x27; comp line, and the complaint file. Where each one lives.</description>
      <pubDate>Thu, 20 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Work Done Without a Permit: What You Inherit</title>
      <link>https://thebidsheet.docsanddeadlines.com/permits/skip-the-permit-discount-what-you-inherit/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/permits/skip-the-permit-discount-what-you-inherit/</guid>
      <description>Waiving the permit line shaves a few hundred dollars off a bid today. At closing, disclosure forms, appraisals, and your insurer ask for it back.</description>
      <pubDate>Wed, 19 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>AHRI Directory Lookup: Verify the System on Your Bid</title>
      <link>https://thebidsheet.docsanddeadlines.com/hvac/verify-hvac-system-ahri-directory/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/hvac/verify-hvac-system-ahri-directory/</guid>
      <description>Your estimate names a condenser and a coil. The AHRI Directory decides whether that pair was ever rated together, and which columns say it wasn&#x27;t.</description>
      <pubDate>Wed, 19 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Change Order Clause: How It Reopens a Fixed Price</title>
      <link>https://thebidsheet.docsanddeadlines.com/bids/change-order-clause-fixed-price/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/bids/change-order-clause-fixed-price/</guid>
      <description>One sentence buried under the total turns a fixed bid into an open one. How to read the change-order clause, and the four blanks to fill in before you sign.</description>
      <pubDate>Tue, 18 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Do I Need a 200 Amp Panel: Run the Load Calculation</title>
      <link>https://thebidsheet.docsanddeadlines.com/electrical/do-you-need-200-amp-panel-load-calculation/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/electrical/do-you-need-200-amp-panel-load-calculation/</guid>
      <description>A panel upgrade quote should arrive with arithmetic. Here is the NEC optional load calculation, worked twice with real numbers, so you can check it yourself.</description>
      <pubDate>Tue, 18 Aug 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>HVAC Replacement Estimate: The 14 Lines It Must Show</title>
      <link>https://thebidsheet.docsanddeadlines.com/bids/hvac-replacement-bid-14-lines/</link>
      <guid isPermaLink="true">https://thebidsheet.docsanddeadlines.com/bids/hvac-replacement-bid-14-lines/</guid>
      <description>Three estimates, three different jobs. Here are the 14 lines an HVAC replacement bid has to name, and exactly what breaks when each one is left off.</description>
      <pubDate>Mon, 17 Aug 2026 00:00:00 +0000</pubDate>
    </item>
</channel></rss>
